Pre-Bid Conference and website go to: Scheduled for August twenty fourth,2022 at 10:00 AM. Meet at Lenoir County Public Schools Maintenance Office, 500 Abbott Street, Kinston NC 28504. Inspection of the location(s) shall be scheduled instantly after the Pre-Bid Conference. Complete website go to is necessary.Contractor Qualifications and Scope of Work:Sealed bids from licensed contractors shall be acquired by Lenoir County Public Schools, Kinston, North Carolina on September seventh, 2022 for furnishing of labor, materials, and tools for the Lenoir County Public Schools HVAC Controls Upgrade Project, 500 Abbott Street, Kinston, NC 28504. Bids shall be acquired as much as 2:00 PM from Single Prime bidders at which era and place all bids shall be publicly opened and browse aloud. Deliver bids to the Lenoir County Public Schools Maintenance Office positioned at 500 Abbott Street, Kinston, NC 28504.Mandatory website go to is scheduled for August twenty fourth, 2022 at 10:00am. Must be current at scheduled pre-bid proposal convention and website go to to submit a bid.Each proposal shall be accompanied by a press release of {qualifications}.that demonstrates expertise in not less than three (3) initiatives of comparable scope inside the previous ten (10) years with references. Project references should be of comparable scope and dimension to be relevant.No bid could also be withdrawn after the scheduled closing time for the receipt of bids for aperiod of sixty (60) days.Bid safety required is 5% of the bid in money, licensed verify, or Bid Bond.Performance and Payment Bonds for 100% of the contract quantity shall be required.Total bid quantity of this undertaking should not exceed 30% of contractor’s full bonding capability.Lenoir County Public Schools reserves the proper to reject any and all bids and to waiveinformalities or irregularities.The Bidders, whether or not residents or nonresidents in North Carolina should be capable to present documented proof of the next:Contractor’s license in good standing with the North Carolina GeneralContractor’s Licensure Board (or NC State Board of Examiners forPlumbing, Mechanical, Electrical, and / or Fire Protection solely initiatives)with the suitable degree of limitations and classifications.The Owner will contemplate, in figuring out the {qualifications} of a Bidder, their recordin the efficiency of any contracts for building work into which they could haveentered with the Owner or with comparable public or personal our bodies or firms. TheOwner expressly reserves the proper to reject the bid of any Bidder if such recorddiscloses that such Bidder, within the opinion of the Owner, has not correctly performedsuch contracts or has habitually and with out simply trigger uncared for the fee ofbills, or has in any other case disregarded his obligations, Subcontractors, materials males,suppliers or staff.The Owner might make such investigation as they deem needed to find out theability of the Bidder to carry out the work, and the Bidder shall furnish to the Ownerall such data and information for this objective as they could request. The Ownerreserves the proper to reject any bid if the proof submitted by, or investigation ofsuch Bidder, fails to fulfill the Owner that such Bidder is a responsive andresponsible Bidder in accordance with the factors set forth herein. Conditional bids won’t be accepted.All relevant Federal, State and Local Taxes shall be included within the Bidder’s proposal.Bidder’s limits for business basic legal responsibility, auto, staff compensation, extreme/umbrella insurance coverage protection ought to be $5M for every.TYPES OF INSURANCE REQUIREDLimits Of Coverage (Minimum Limits)Workers’ Compensation (U.S. Only) (Alternatively, Contractor can provide proof as a state certified self-insured companyStatutoryEmployers’ Liability (U.S. Only)$5,000,000 Each Accident & DiseaseCommercial General Liability Insurance $5,000,000 per Occurrence $5,000,000 Aggregate Bodily Injury, Property Damage and Loss of lifeAutocellular Liability Insurance for Any Auto used within the success of this settlement$5,000,000 per AccidentCrime Insurance/Fidelity Bond$2,000,000 every ClaimProfessional Liability or Errors & Omissions Liability Insurance$2,000,000 every Claim $2,000,000 AggregateCyber Liability Insurance$5,000,000 every Claim $5,000,000 AggregateUpon execution of this Agreement and thirty (30) days previous to the expiration of the required insurance coverage, Contractor / Supplier / Service Provider should present proof of insurance coverage. Certificate should: Be on an ACORD kind Evidence required insurance coverage coverages & limits Notice of cancellation shall be in accordance with coverage provisions Must be signed by a certified consultant of Contractor’s insurance coverage firm Confirm insurance coverage corporations are rated A-VII or higher by A.M. Best Company Prior to Contract award or inside seven days of the Owner’s request to take action, thesuccessful Bidder shall be ready to exhibit that his current group,direct labor drive and prior work expertise is of sufficient dimension and developmentto preserve accountable management of the undertaking and to schedule, coordinate andperform the work in an expeditious method and in accordance with the ContractPaperwork.Project shall be accomplished in 18 months from Notice To Proceed by Lenoir County Public Schools.The Contractor shall furnish and set up an entire constructing automation system together with all needed {hardware} and all working and functions software program essential to carry out the management sequences of operation as referred to as for on this doc or to attain present sequences as recognized by LCS. All parts of the system –servers, utility controllers, unitary controllers, and so on. shall talk utilizing the BACnet protocol, as outlined by ASHRAE Standard 135-2007, or EIA commonplace 709.1, the LonTalk™ protocol, or Modbus protocol. No gateways shall be used for communication to controllers for this undertaking. Except as in any other case famous, the management system shall encompass all needed Ethernet Network Controllers, Standalone Digital Control Units, enterprise server, software program, sensors, transducers, relays, valves, dampers, damper operators, management panels, and different accent tools, for a whole and operable system. Existing enter/output wiring might be reused if suitable with new system being put in. All communications wiring should be put in as new wiring (ethernet or MSTP/shielded).The BAS contractor shall overview and research all present management drawings (as supplied by proprietor) and your entire scope of labor to familiarize themselves with the contract scope.All wiring and set up of management units related to the tools listed under shall be supplied underneath this Contract. Existing enter/output wiring might be reused if suitable with new system and is in good situation. When the BAS system is totally put in and operational, the BAS Contractor and representatives of the Owner will overview and take a look at the system. At that point, the BAS contractor shall exhibit the operation of the system and show that it complies with the intent of the scope of labor and present sequences.All work carried out as part of this undertaking will adjust to all governing codes, legal guidelines and governing our bodies. The Contractor shall receive and pay for all needed building permits and licenses.Provide full controls store drawing submittal data to incorporate full controller enter/output related factors, wiring diagrams for all units, community communications riser, and information sheets for all units and tools being supplied. Each faculty website should have its personal set of store drawing submittal diagrams.Provide Project Manager whose solely undertaking accountability is to coordinate the set up and talk with Lenoir County Schools on undertaking scheduling of contractor’s staff and entry to buildings. Minimal downtime of kit shall be allowed throughout occupied hours. Project Manager can’t be a working technician, electrician/installer, or programmer/graphic technician. Attendance at bi-weekly (at minimal) undertaking conferences by Project Manager shall be required.Controls contractor should embody all coordination, programming, graphics, startup of kit, and area checkout.Provide one-year guarantee on all new put in management toolsControls and interlock wiring per electrical code. Plenum rated cable to be put in above lay-in ceilings and strapped/supported appropriately. All wiring positioned in mechanical rooms and areas with uncovered ceilings shall be put in wiring in conduit. Existing conduit might be reused whether it is in good situation. Each separate constructing may have a community controller(s) put in with Lenoir Schools LAN connection. Contractor to put in CAT 6 wiring again to telecom room for every connection. LCS to attach and assign/configure IP addresses.In accordance to the scope of labor, the system shall additionally present a graphical, web-based, operator interface that permits for immediate entry to any system by means of a typical browser. The contractor should present a BAS server (appropriately sized), and microcomputer controllers of modular design offering distributed processing functionality, and permitting future enlargement of each enter/output factors and processing/management features.Ethernet-based Network Router and/or Network Server Controller(s): The BAS Contractor shall furnish Ethernet-based Network Server Controllers as described. These controllers will join on to the BAS server over Ethernet at a minimal of 100mbps, and supply communication to the Standalone Digital Control Units and/or different Input/Output Modules. Network Server Controllers shall conform to BACnet gadget profile B-BC. Network controllers that make the most of RS232 serial communications or ARCNET to speak with the workstations won’t be accepted.Network Controllers shall be examined and licensed by the BACnet Testing Laboratory (BTL) as Network Server Controllers (B-BC). Standalone Digital Control Units (SDCUs): Provide the mandatory amount and kinds of SDCUs to satisfy the necessities of the undertaking for mechanical tools management together with air handlers, central plant management, and terminal unit management, and as recognized in present management drawings supplied by LCS. Each SDCU shall have the aptitude to function fully standalone, containing all the I/O and applications to regulate its related tools. BACnet SDCUs shall be examined and licensed by the BACnet Testing Laboratory (BTL). SDCUs shall talk with the constructing Network Server Controller over ethernet (TCP/IP) wiring. MSTP (shielded RS485 wiring) communications between SDCUs shall not be allowed besides in distinctive circumstances the place tools kind and site deems it permissible as decided by the proprietor.All work described on this doc shall be put in, wired, and circuit examined by manufacturing unit licensed technicians certified for this work and within the common employment of the authorized producer’s native area workplace. The authorized producer’s native area workplace shall have a minimal of 15 years of set up expertise with the producer and shall present documentation within the bid and submittal package deal verifying longevity of the putting in firm’s relationship with the producer when requested. Supervision, {hardware} and software program engineering, and checkout of the system shall be by the workers of the authorized producer’s native area workplace and shall not be subcontracted. The management contractor shall have an in place help facility inside 100 miles of the Lenoir County Schools Maintenance Department with manufacturing unit licensed technicians and engineers, spare components stock and all needed check and diagnostic tools for the put in system, and the management contractor shall have 24 hours/day, 7 days/week emergency service out there.Provide BAS parts and ancillary tools, that are UL-916 listed and labeled. All tools or piping utilized in conditioned air streams, areas or return air plenums shall adjust to NFPA 90A Flame/Smoke/Fuel contribution ranking of 25/50/0 and all relevant constructing codes or necessities. All wiring shall conform to the National Electrical Code. Comply with FCC guidelines, Part 15 concerning Class A radiation for computing units and low energy communication tools working in business environments. All store drawings shall be ready in Visio Professional or AutoCAD software program. In addition to the drawings, the Contractor shall furnish a CD containing the equivalent data. Shop drawings shall embody a riser diagram depicting places of all controllers and workstations, with related community wiring. Also included shall be particular person schematics of every mechanical system exhibiting all related factors just about their related controller. Typicals shall be allowed the place applicable. Submittal information shall include producer’s information on all {hardware} and software program merchandise required by the specification. Submittals shall include narrative descriptions of sequences of operation. Diagrams shall be on 11” by 17” foldouts.Submit 5 (5) digital copies and (2) hardcopies of submittal information and store drawings to the Engineer for overview previous to ordering or fabrication of the tools. The Contractor, previous to submitting, shall verify all paperwork for accuracy. The following is a listing of submit building submittals that shall be up to date to replicate any modifications throughout building and re-submitted as “As-Built”.System structure drawing.Layout drawing for every management panelWiring diagram for particular person partsSystem stream diagram for every managed systemInstrumentation checklist for every managed systemSequence of controlOperation and Maintenance ManualsInformation widespread to your entire system shall be supplied. This shall embody however not be restricted to the next.Product manuals for the important thing software program duties.Operating the system.Administrating the system.Engineering the operator workstation.Application programming.Engineering the community.Setting up the online server.Report creation.Graphics creation.All different engineering duties.System Architecture Diagram.Reference the product handbook that features directions on executing the duty.Names, addresses, and phone numbers of putting in contractors and repair representatives for tools and management techniques.Licenses, ensures, and guarantee paperwork for tools and techniques.Submit one copy for every constructing, plus two further copies.Information widespread to the techniques in a single constructing shall be supplied.System structure diagram for parts inside the constructing annotated with particular location data.As-built drawing for every management panel.As-built wiring design diagram for all parts.Installation design particulars for every I/O gadget.As-built system stream diagram for every system.Sequence of management for every system.Product information sheet for every element.Installation information sheet for every element.Submit two copies for every constructing and two further copies. Software shall be supplied:Submit a duplicate of all software program put in on the community controllers and server.Submit all licensing data for all software program put in on the servers.Submit a duplicate of all software program used to execute the undertaking even when the software program was not put in on the servers. Submit all licensing data for all the software program used to execute the undertaking. All software program revisions shall be as put in on the time of the system acceptance.Firmware RecordsdataSubmit a duplicate of all firmware information that have been downloaded to or pre-installed on any units put in as a part of this undertaking. This doesn’t apply to firmware that’s completely burned on a chip on the manufacturing unit and might solely get replaced by changing the chip.Submit a duplicate of all utility information that have been created throughout the execution of the undertaking. Submit a duplicate of all graphic web page information created throughout the execution of the undertaking. The Owner shall retain licenses to software program for this undertaking.The BAS Contractor shall present a technician a minimal of 64 hours as required to confirm with proprietor the sequences of operation and system operation.Startup Testing shall be carried out for every job on the startup check guidelines, which shall be initialed by the technician and dated upon check completion. Any deviations from the submitted set up plan shall even be recorded. Required components of the startup testing embody:Measurement of voltage sources, major and secondary Verification of correct controller energy wiring.Verification of element stock when in comparison with the submittals.Verification of labeling on parts and wiring.Verification of connection integrity and high quality (unfastened strands and tight connections).Verification of bus topology, grounding of shields and set up of termination units.Verification of level checkout.Each I/O gadget is landed per the submittals and features per the sequence of management.Analog sensors are correctly scaled and a price is reportedBinary sensors have the proper regular place and the state is accurately reported.Analog outputs have the proper regular place and transfer full stroke when so commanded.Binary outputs have the proper regular state and reply appropriately to energise/de-energize instructions.Documentation of analog sensor calibration (measured worth, reported worth and calculated offset).Documentation of Loop tuning (pattern price, achieve and integral time fixed).All parts, system software program, and components furnished and put in by the BMS contractor shall be assured in opposition to defects in supplies and workmanship for 1 12 months of considerable completion. Labor to restore, reprogram, or change these parts shall be furnished by the BMS contractor at no cost throughout regular working hours throughout the guarantee interval. Materials furnished however not put in by the BMS contractor shall be lined to the extent of the product solely. Installation labor shall be the accountability of the commerce contractor performing the set up. All corrective software program modifications made throughout guarantee durations shall be up to date on all person documentation and on person and producer archived software program disks. The Contractor shall reply to the proprietor’s request for guarantee service inside 24 commonplace working hours.The BAS Contractor shall present on-site coaching to the Owner’s consultant and upkeep personnel per the next description:On-site coaching shall encompass a minimal of (2) hours per website of hands-on instruction geared on the operation and upkeep of the techniques. The curriculum shall embodySystem OverviewSystem Software and OperationSystem entrySoftware options overviewChanging setpoints and different attributesSchedulingModifying programmed variablesDisplaying coloration graphicsRunning reviewsViewing utility programmingOperational sequences together with start-up, shutdownEquipment upkeep.Acceptable producers/merchandise (should be a company Branch workplace of the product being put in and NOT an impartial reseller for merchandise/producer listed:Schneider Electric Buildings Local Branch – EcoStruxureSiemens native department workplace Automated Logic native department workplaceThe Building Automation System (BAS) shall encompass Network Server/Controllers (NSCs), a household of Standalone Digital Control Units (SDCUs), and Enterprise Network Server. The BAS shall present management, alarm detection, scheduling, reporting and knowledge administration for your entire facility, and Wide Area Network (WAN) if relevant. An Enterprise Level BAS shall encompass an Enterprise Server, which allows a number of NSCs (together with all graphics, alarms, schedules, traits, programming, and configuration) to be accessible from a single Workstation concurrently for operations and engineering duties. The Enterprise Level BAS shall be capable to host as much as 250 servers, or NSCs, beneath it. The fieldbus layer shall help all the next kinds of SDCUs:BACnet IP SDCU necessities: The system shall encompass a number of BACnet IP area buses managed by the Network Server Controller. Minimum velocity of not lower than 100Mbps. The area bus controllers shall help daisy chain topology of as much as 50 controllers. The area bus controllers shall additionally help, the place relevant, RSTP loop whereby as much as 39 controllers are supported. These units shall help a BACnet protocol stack in accordance with the ANSI/ASHRAE Standard 135-2008 and the BACnet Device Profile supported.BACnet MS/TP SDCU necessities: The system shall encompass a number of BACnet MS/TP area buses managed by the Network Server Controller. Minimum velocity shall be 76.8kbps. The area bus layer consists of an RS485, token passing bus that helps as much as 127 Standalone Digital Control Units (SDCUs) for operation of HVAC and lighting tools. These units shall conform to BACnet commonplace 135-2007. The NSCs shall be able to not less than two BACnet MS/TP area buses for a complete functionality of 254 SDCUs per NSC. Bacnet MS/TP SDCUs solely allowed in distinctive circumstances the place tools kind and site deems it permissible as decided by the proprietor.The Enterprise Server shall encompass the next:ProcessorMinimum: Intel Core i5 @ 2.0 GHz or equivalentRecommended: Intel Core i5 @ 3.0 GHz or betterMemoryMinimum: 4GBRecommended: 8GB or largerOperating techniques:Microsoft Windows 7 64-bitMicrosoft Windows 10 64-bit Microsoft Windows Server 2012 R2 64-bit Microsoft Windows Server 2016Microsoft Windows Server 2019 10/100MBPS Ethernet NIC Storage – Minimum: 1TBSolid State Drive beneficialRequired extra software program – Microsoft .Net 4.7.2 and laterMicrosoft .Net 4.7.2 and laterLicense settlement for all relevant softwareExternal log storage optionPostgreSQL 11.0 and laterTimescaleDB 1.2 and laterThe software program shall be designed so that every person of the software program can have a singular username and password. This username/password mixture shall be linked to a set of capabilities inside the software program, set by and editable solely by, a system administrator. The units of capabilities shall vary from View solely, Acknowledge alarms, Enable/disable and alter values, Program, and Administer. The system shall permit the above capabilities to be utilized independently to every class of object within the system. The system should permit a minimal of 256 customers to be configured per workstation. Additionally, the software program shall allow the power so as to add/take away customers based mostly upon Microsoft Windows Security Domains that allow the client IT division to help in person entry. Scheduling From the workstation (supplied by proprietor) or webstation (supplied by proprietor), it shall be doable to configure and obtain schedules for any of the controllers on the community. Time of day schedules shall be in a calendar type and viewable in each a graphical and tabular view.Schedules shall be programmable for at least one 12 months prematurely.To change the schedule for a specific day, a person shall merely choose the day and make the specified modifications.Additionally, from the operator webstations(supplied by proprietor), every schedule will seem on the display screen viewable as your entire 12 months, month-to-month, week and day. A easy mouse click on shall permit switching between views. It shall even be doable to scroll from one month to the following and look at or alter any of the schedule occasions. Schedules shall be assigned to particular controllers and saved of their native RAM reminiscence. Any modifications made on the workstation(supplied by proprietor) shall be mechanically up to date to the corresponding schedule within the controller.It shall be doable to assign a lead schedule such that shadow/native schedules are up to date based mostly upon modifications within the Lead.It shall be doable to assign a listing(s) of exception occasion days, dates, date ranges to a schedule.It shall be doable to view mixed views exhibiting the calendar and all prioritized exemptions on one display screen.It ought to accommodate a minimal of 16 precedence ranges.Values ought to be capable to be managed straight from a schedule, with out the necessity for particular program logic.Day-to-day operation of the system shall be accessible by means of a typical internet browser interface, permitting technicians and operators to view any a part of the system from wherever on the community. The system shall be capable to be accessed on website through a cellular gadget atmosphere with, at a minimal, entry to overwrite and look at system values. History Logging: Each NSC controller shall be able to LOCALLY logging any enter, output, calculated worth or different system variable both over person outlined time intervals starting from 1 second to 1440 minutes or based mostly upon a person configurable change of worth. A minimal of 1000 logs, with a minimal of 100,000 information, shall be saved. Each log can file both the instantaneous, common, minimal or most worth of the purpose. Logged information shall be downloadable to the next degree NSC long run archiving based mostly upon user-defined time intervals, or handbook command.For prolonged development logging a minimal of 1500 traits shall be succesful, with a minimal variety of 600,000 information inside.Management of an influence meter substitute to make sure meter log information is correct shall be doable within the NSC.Every {hardware} enter and output level, hosted inside the NSC and hooked up I/O modules, shall be trended mechanically with out the requirement for handbook creation, and every of those logs shall log values based mostly upon a change of worth and retailer not less than 500 development samples earlier than changing the oldest pattern with new information.The presentation of logged information shall be constructed into the server capabilities of the NSC Presentation might be in time stamped checklist codecs or in a chart format with totally configurable pen colours, weights, scales and time spans.Identify all management wires with labeling tape or sleeves utilizing phrases, letters, or numbers that may be precisely cross-referenced with as-built drawings.Switch-over from the prevailing management system to the brand new system shall be totally coordinated with the Owner. A consultant of the Owner shall be on website throughout switch-over. After regular faculty hours work will presumably be required to attenuate class disturbance and tools downtime. Coordinate with proprietor.The Contractor shall reduce management system downtime throughout switch-over. Sufficient set up mechanics shall be on website in order that your entire switch-over might be completed in an inexpensive timeframe.Each I/O gadget (each area mounted in addition to these positioned in FIPs) shall be inspected and verified for correct set up and performance. A checkout sheet itemizing every gadget shall be crammed out, dated and authorized by the Project Manager for submission to the proprietor or proprietor’s consultant.All utility software program shall be verified and in contrast in opposition to the sequences of operation. Control loops shall be exercised by inducing a setpoint shift of not less than 10% and observing whether or not the system efficiently returns the method variable to setpoint.Test alarms within the system and validate that the system generates the suitable alarm message, that the message seems in any respect prescribed locations (workstations or printers), and that every other associated actions happen as outlined (i.e. graphic panels are invoked, reviews are generated, and so on.).Perform an operational check of every distinctive graphic show and report back to confirm that the merchandise exists, that the looks and content material are appropriate, and that any particular options work as supposed. Perform an operational check of every third celebration interface that has been included as a part of the automation system. Verify that each one factors are correctly polled, that alarms have been configured, and that any related graphics and reviews have been accomplished. If the interface entails a file switch over Ethernet, check any logic that controls the transmission of the file, and confirm the content material of the required data.Server & LicensingEnterprise system licensing and setupAll required laptop {hardware} (supplied by contractor) for brand new BAS system to be positioned at LCS Facilities workplaceProvide rack/meeting and rack mount server; to be positioned at LCS Facilities workplace. Server to be sized appropriately and specs recognized above for a totally purposeful system.Labor to setup traits for relevant enter/output factors shall be included.Global development configurationBanks Elementary School Upgrade – particular scopeFurnish and set up Network controller(s) and Bacnet IP DDC panelsInstall new communication wiring (IP) to every controller locationDemo present ACT management boards (Qty. 3), sensors and management units as change needed. Control valves/actuators, dampers and actuators are excluded from restore or substituteFurnish and set up Bacnet IP DDC panels with manufacturing unit mounted controller in similar location as ACT boardsReplace present ACT room temperature sensors, exterior air temp, effectively temperature sensors and relays; wire to BAS controller(s)Remove (1) UNC-520 Jace, (15) MZ2A-102[Microzone II) and (11) PEM[Packaged Equipment Module] controllersInstall new Bacnet IP DDC controllers to switch present controllers being eliminated. Existing Microzone and PEM enclosures could also be reused if house permits.Mount new DDC panels with new DDC controllers instead of ACT management boardsRemove and change house temperature sensors with sensors which embody LCD show, setpoint adjustment, and override If suitable with new system, re-use present duct and water temperature/strain sensors, present sensing standing switches, static strain transmitters, and low-limit thermostats the place suitable and re-wire present management factors from present controllers to new DDC controllers. All valves/actuators and damper/actuators to be re-used. If units are discovered faulty throughout new system startup, contractor shall notify the proprietor for path.Regardless of compatibility with new system, house mounted temperature sensors shall get replaced with sensors which embody LCD show, setpoint adjustment, and override.Replace all management relays.Replace present CO2/humidity sensors as a result of age of sensors.Reuse present enter/output wiring to the biggest extent doableInstall CAT 6 cable from new community controllers again to LCS telecom room for connection/configuration by others.Commissioning and proprietor demonstration labor as recognized typically scope aboveContentnea-Savannah Ok-8 School UpgradeFurnish and set up Network controller(s) and Bacnet IP DDC panelsInstall new communication wiring (IP) to every controller locationRemove (2) UNC-520 Jaces, (78) MZ2A-102[Microzone II] and (70) PEM[Packaged Equipment Module] controllersInstall new Bacnet IP DDC controllers in present Microzone-PEM enclosuresMount new DDC panels with Bacnet IP DDC controllers instead of ACT management boardsRemove and change house temperature sensors with sensors which embody LCD show, setpoint adjustment, and override If suitable with new system, re-use present duct and water temperature/strain sensors, present sensing standing switches, static strain transmitters, and low-limit thermostats the place suitable and re-wire present management factors from present controllers to new DDC controllers. All valves/actuators and damper/actuators to be re-used. If units are discovered faulty throughout new system startup, contractor shall notify the proprietor for path.Regardless of compatibility with new system, house mounted temperature sensors shall get replaced with sensors which embody LCD show, setpoint adjustment, and override.Replace present CO2/humidity sensors as a result of age of sensors.Reuse present enter/output wiring to the biggest extent doableInstall CAT 6 cable from new community controllers again to LCS telecom room for connection/configuration by others.Commissioning and proprietor demonstration labor as recognized typically scope aboveLaGrange Elementary School UpgradeFurnish and set up Network controller(s) and Bacnet IP DDC panelsInstall new communication wiring (IP) to every controller locationRemove (1) UNC-520, (44) MZ2A-102[Microzone II] and (40) PEM[Packaged Equipment Module] controllersInstall new Bacnet IP DDC controllers in present Microzone-PEM enclosuresMount new DDC panels with Bacnet IP DDC controllers instead of ACT management boardsRemove and change house temperature sensors with sensors which embody LCD show, setpoint adjustment, and override If suitable with new system, re-use present duct and water temperature/strain sensors, present sensing standing switches, static strain transmitters, and low-limit thermostats the place suitable and re-wire present management factors from present controllers to new DDC controllers. All valves/actuators and damper/actuators to be re-used. If units are discovered faulty throughout new system startup, contractor shall notify the proprietor for path.Regardless of compatibility with new system, house mounted temperature sensors shall get replaced with sensors which embody LCD show, setpoint adjustment, and override.Replace all management relays.Replace present CO2/humidity sensors as a result of age of sensors.Reuse present enter/output wiring to the biggest extent doableInstall CAT 6 cable from new community controllers again to LCS telecom room for connection/configuration by others.Commissioning and proprietor demonstration labor as recognized typically scope aboveMoss Hill Elementary School UpgradeFurnish and set up Network controller(s) and Bacnet IP DDC panelsInstall new communication wiring (IP) to every controller locationDemo present ACT management boards (Qty. 3), sensors and management units as change needed. Control valves/actuators, dampers and actuators are excluded from restore or substituteFurnish and set up Bacnet IP DDC panels with manufacturing unit mounted controller in similar location as ACT boardsReplace present ACT room temperature sensors, exterior air temp, effectively temperature sensors and relays; wire to BAS controller(s)Remove (1) UNC-520 Jace, (19) MZ2A-102[Microzone II] and (15) PEM[Packaged Equipment Module] controllersInstall new Bacnet IP DDC controllers to switch present controllers being eliminated. Existing Microzone and PEM enclosures could also be reused if house permits.Mount new DDC panels with new DDC controllers instead of ACT management boardsRemove and change house temperature sensors with sensors which embody LCD show, setpoint adjustment, and override If suitable with new system, re-use present duct and water temperature/strain sensors, present sensing standing switches, static strain transmitters, and low-limit thermostats the place suitable and re-wire present management factors from present controllers to new DDC controllers. All valves/actuators and damper/actuators to be re-used. If units are discovered faulty throughout new system startup, contractor shall notify the proprietor for path.Regardless of compatibility with new system, house mounted temperature sensors shall get replaced with sensors which embody LCD show, setpoint adjustment, and override.Replace all management relays.Replace present CO2/humidity sensors as a result of age of sensors.Reuse present enter/output wiring to the biggest extent doableInstall CAT 6 cable from new community controllers again to LCS telecom room for connection/configuration by others.Commissioning and proprietor demonstration labor as recognized typically scope aboveNortheast Elementary School UpgradeFurnish and set up Network controller(s) and Bacnet IP DDC panelsInstall new communication wiring (IP) to every controller locationRemove (2) UNC-520, (53) MZ2A-102[Microzone II] and (49) PEM[Packaged Equipment Module] controllersInstall new Bacnet IP DDC controllers in present Microzone-PEM enclosuresMount new DDC panels with Bacnet IP DDC controllers instead of ACT management boardsRemove and change house temperature sensors with sensors which embody LCD show, setpoint adjustment, and override If suitable with new system, re-use present duct and water temperature/strain sensors, present sensing standing switches, static strain transmitters, and low-limit thermostats the place suitable and re-wire present management factors from present controllers to new DDC controllers. All valves/actuators and damper/actuators to be re-used. If units are discovered faulty throughout new system startup, contractor shall notify the proprietor for path.Regardless of compatibility with new system, house mounted temperature sensors shall get replaced with sensors which embody LCD show, setpoint adjustment, and override.Replace present CO2/humidity sensors as a result of age of sensors.Reuse present enter/output wiring to the biggest extent doableInstall CAT 6 cable from new community controllers again to LCS telecom room for connection/configuration by others.Commissioning and proprietor demonstration labor as recognized typically scope aboveNorthwest Elementary School UpgradeFurnish and set up Network controller(s) and Bacnet IP DDC panelsInstall new communication wiring (IP) to every controller locationDemo present ACT management boards (Qty. 3), sensors and management units as change needed. Control valves/actuators, dampers and actuators are excluded from restore or substituteFurnish and set up Bacnet IP DDC panels with manufacturing unit mounted controller in similar location as ACT boardsReplace present ACT room temperature sensors, exterior air temp, effectively temperature sensors and relays; wire to BAS controller(s)Remove and change house temperature sensors with sensors which embody LCD show, setpoint adjustment, and override If suitable with new system, re-use present duct and water temperature/strain sensors, present sensing standing switches, static strain transmitters, and low-limit thermostats the place suitable and re-wire present management factors from present controllers to new DDC controllers. All valves/actuators and damper/actuators to be re-used. If units are discovered faulty throughout new system startup, contractor shall notify the proprietor for path.Regardless of compatibility with new system, house mounted temperature sensors shall get replaced with sensors which embody LCD show, setpoint adjustment, and override.Reuse present enter/output wiring to the biggest extent doableInstall CAT 6 cable from new community controllers again to LCS telecom room for connection/configuration by others.Commissioning and proprietor demonstration labor as recognized typically scope abovePink Hill Elementary School UpgradeFurnish and set up Network controller(s) and Bacnet IP DDC panelsInstall new communication wiring (IP) to every controller locationRemove (2) UNC-520 JACE, (50) MZ2A-102[Microzone II] and (49) PEM[Packaged Equipment Module] controllersInstall new Bacnet IP DDC controllers in present Microzone-PEM enclosuresMount new DDC panels with Bacnet IP DDC controllers instead of ACT management boardsRemove and change house temperature sensors with sensors which embody LCD show, setpoint adjustment, and override If suitable with new system, re-use present duct and water temperature/strain sensors, present sensing standing switches, static strain transmitters, and low-limit thermostats the place suitable and re-wire present management factors from present controllers to new DDC controllers. All valves/actuators and damper/actuators to be re-used. If units are discovered faulty throughout new system startup, contractor shall notify the proprietor for path.Regardless of compatibility with new system, house mounted temperature sensors shall get replaced with sensors which embody LCD show, setpoint adjustment, and override.Replace present CO2/humidity sensors as a result of age of sensors.Reuse present enter/output wiring to the biggest extent doableInstall CAT 6 cable from new community controllers again to LCS telecom room for connection/configuration by others.Commissioning and proprietor demonstration labor as recognized typically scope aboveSoutheast Elementary School UpgradeFurnish and set up Network controller(s) and Bacnet IP DDC panelsInstall new communication wiring (IP) to every controller locationDemo present ACT management boards (Qty. 3), sensors and management units and change needed. Control valves/actuators, dampers and actuators are excluded from restore or substituteRemove present UNC-520 JACE and (5) MZ2A-102[Microzone II] controllersInstall new Bacnet IP DDC controllers in present Microzone-PEM enclosuresMount new DDC panels with Bacnet IP DDC controllers instead of ACT management boardsRemove and change house temperature sensors with sensors which embody LCD show, setpoint adjustment, and override If suitable with new system, re-use present duct and water temperature/strain sensors, present sensing standing switches, static strain transmitters, and low-limit thermostats the place suitable and re-wire present management factors from present controllers to new DDC controllers. All valves/actuators and damper/actuators to be re-used. If units are discovered faulty throughout new system startup, contractor shall notify the proprietor for path.Regardless of compatibility with new system, house mounted temperature sensors shall get replaced with sensors which embody LCD show, setpoint adjustment, and override.Replace present CO2/humidity sensors as a result of age of sensors.Reuse present enter/output wiring to the biggest extent doableInstall CAT 6 cable from new community controllers again to LCS telecom room for connection/configuration by others.Commissioning and proprietor demonstration labor as recognized typically scope aboveSouthwood Elementary School UpgradeFurnish and set up Network controller(s) and Bacnet IP DDC panelsInstall new communication wiring (IP) to every controller locationDemo present ACT management boards (Qty. 3), sensors and management units and change needed. Control valves/actuators, dampers and actuators are excluded from restore or substituteReuse present management wiring the place relevantMount new DDC panels with Bacnet IP DDC controllers instead of ACT management boardsReplace present house temp sensors, exterior air temp sensor and effectively temp sensors; wire to BAS controller(s)Remove and change house temperature sensors with sensors which embody LCD show, setpoint adjustment, and override If suitable with new system, re-use present duct and water temperature/strain sensors, present sensing standing switches, static strain transmitters, and low-limit thermostats the place suitable and re-wire present management factors from present controllers to new DDC controllers. All valves/actuators and damper/actuators to be re-used. If units are discovered faulty throughout new system startup, contractor shall notify the proprietor for path.Regardless of compatibility with new system, house mounted temperature sensors shall get replaced with sensors which embody LCD show, setpoint adjustment, and override.Reuse present enter/output wiring to the biggest extent doableInstall CAT 6 cable from new community controllers again to LCS telecom room for connection/configuration by others.Commissioning and proprietor demonstration labor as recognized typically scope aboveE.B. Frink Middle School UpgradeFurnish and set up Network controller(s) and Bacnet IP DDC panelsInstall new communication wiring (IP) to every controller locationDemo present ACT management boards (Qty. 3), sensors and management units and change needed. Control valves/actuators, dampers and actuators are excluded from restore or substitute Reuse present management wiring the place relevantMount new DDC panels with Bacnet IP DDC controllers instead of ACT management boardsReplace present house temp sensors, exterior air temp sensor and effectively temp sensors; wire to BAS controller(s)Remove and change house temperature sensors with sensors which embody LCD show, setpoint adjustment, and override If suitable with new system, re-use present duct and water temperature/strain sensors, present sensing standing switches, static strain transmitters, and low-limit thermostats the place suitable and re-wire present management factors from present controllers to new DDC controllers. All valves/actuators and damper/actuators to be re-used. If units are discovered faulty throughout new system startup, contractor shall notify the proprietor for path.Regardless of compatibility with new system, house mounted temperature sensors shall get replaced with sensors which embody LCD show, setpoint adjustment, and override.ACT Board #3 is not in use or doesn’t exist per LCS personnelReuse present enter/output wiring to the biggest extent doableInstall CAT 6 cable from new community controllers again to LCS telecom room for connection/configuration by others.Commissioning and proprietor demonstration labor as recognized typically scope aboveRochelle Middle School UpgradeFurnish and set up Network controller(s) and Bacnet IP DDC panelsInstall new communication wiring (IP) to every controller locationDemo present ACT management boards (Qty. 2), sensors and management units and change needed. Control valves/actuators, dampers and actuators are excluded from restore or substitute Reuse present management wiring the place relevantMount new DDC panels with Bacnet IP DDC controllers instead of ACT management boardsReplace present house temp sensors, exterior air temp sensor and effectively temp sensors; wire to BAS controller(s)Remove and change house temperature sensors with sensors which embody LCD show, setpoint adjustment, and override If suitable with new system, re-use present duct and water temperature/strain sensors, present sensing standing switches, static strain transmitters, and low-limit thermostats the place suitable and re-wire present management factors from present controllers to new DDC controllers. All valves/actuators and damper/actuators to be re-used. If units are discovered faulty throughout new system startup, contractor shall notify the proprietor for path.Regardless of compatibility with new system, house mounted temperature sensors shall get replaced with sensors which embody LCD show, setpoint adjustment, and override.Reuse present enter/output wiring to the biggest extent doableInstall CAT 6 cable from new community controllers again to LCS telecom room for connection/configuration by others.Commissioning and proprietor demonstration labor as recognized typically scope aboveWoodington Middle School UpgradeFurnish and set up Network controller(s) and Bacnet IP DDC panelsInstall new communication wiring (IP) to every controller locationDemo present ACT management boards (Qty. 10), sensors and management units and change needed. Control valves/actuators, dampers and actuators are excluded from restore or substituteReuse present management wiring the place relevantMount new DDC panels with Bacnet IP DDC controllers instead of ACT management boardsReplace present house temp sensors, exterior air temp sensor and effectively temp sensors; wire to BAS controller(s)Remove and change house temperature sensors with sensors which embody LCD show, setpoint adjustment, and override If suitable with new system, re-use present duct and water temperature/strain sensors, present sensing standing switches, static strain transmitters, and low-limit thermostats the place suitable and re-wire present management factors from present controllers to new DDC controllers. All valves/actuators and damper/actuators to be re-used. If units are discovered faulty throughout new system startup, contractor shall notify the proprietor for path.Regardless of compatibility with new system, house mounted temperature sensors shall get replaced with sensors which embody LCD show, setpoint adjustment, and override.Reuse present enter/output wiring to the biggest extent doableInstall CAT 6 cable from new community controllers again to LCS telecom room for connection/configuration by others.Commissioning and proprietor demonstration labor as recognized typically scope aboveKinston High School UpgradeFurnish and set up Network controller(s) and Bacnet IP DDC panelsInstall new communication wiring (IP) to every controller locationDemo present ACT management boards (Qty. 5), sensors and management units and change needed. Control valves/actuators, dampers and actuators are excluded from restore or substitute Reuse present management wiringMount new DDC panels with Bacnet IP DDC controllers instead of ACT management boardsReplace present house temp sensors, exterior air temp sensor and effectively temp sensors; wire to BAS controller(s)Remove and change house temperature sensors with sensors which embody LCD show, setpoint adjustment, and override If suitable with new system, re-use present duct and water temperature/strain sensors, present sensing standing switches, static strain transmitters, and low-limit thermostats the place suitable and re-wire present management factors from present controllers to new DDC controllers. All valves/actuators and damper/actuators to be re-used. If units are discovered faulty throughout new system startup, contractor shall notify the proprietor for path.Regardless of compatibility with new system, house mounted temperature sensors shall get replaced with sensors which embody LCD show, setpoint adjustment, and override.Reuse present enter/output wiring to the biggest extent doableInstall CAT 6 cable from new community controllers again to LCS telecom room for connection/configuration by others.Commissioning and proprietor demonstration labor as recognized typically scope aboveNorth Lenoir High School UpgradeFurnish and set up Network controller(s) and Bacnet IP DDC panelsInstall new communication wiring (IP) to every controller locationDemo present ACT management boards (Qty. 10), sensors and management units and change needed. Control valves/actuators, dampers and actuators are excluded from restore or substitute Mount new DDC panels with Bacnet IP DDC controllers instead of ACT management boardsReplace present house temp sensors, exterior air temp sensor and effectively temp sensors; wire to BAS controller(s)Remove and change house temperature sensors with sensors which embody LCD show, setpoint adjustment, and override If suitable with new system, re-use present duct and water temperature/strain sensors, present sensing standing switches, static strain transmitters, and low-limit thermostats the place suitable and re-wire present management factors from present controllers to new DDC controllers. All valves/actuators and damper/actuators to be re-used. If units are discovered faulty throughout new system startup, contractor shall notify the proprietor for path.Regardless of compatibility with new system, house mounted temperature sensors shall get replaced with sensors which embody LCD show, setpoint adjustment, and override.Reuse present enter/output wiring to the biggest extent doableInstall CAT 6 cable from new community controllers again to LCS telecom room for connection/configuration by others.Commissioning and proprietor demonstration labor as recognized typically scope aboveSouth Lenoir High School UpgradeFurnish and set up Network controller(s) and Bacnet IP DDC panelsInstall new communication wiring (IP) to every controller locationDemo present ACT management boards (Qty. 7), sensors and management units and change needed. Control valves/actuators, dampers and actuators are excluded from restore or substitute Mount new DDC panels with Bacnet IP DDC controllers instead of ACT management boardsReplace present house temp sensors, exterior air temp sensor and effectively temp sensors; wire to BAS controller(s)Remove and change house temperature sensors with sensors which embody LCD show, setpoint adjustment, and override If suitable with new system, re-use present duct and water temperature/strain sensors, present sensing standing switches, static strain transmitters, and low-limit thermostats the place suitable and re-wire present management factors from present controllers to new DDC controllers. All valves/actuators and damper/actuators to be re-used. If units are discovered faulty throughout new system startup, contractor shall notify the proprietor for path.Regardless of compatibility with new system, house mounted temperature sensors shall get replaced with sensors which embody LCD show, setpoint adjustment, and override.Reuse present enter/output wiring to the biggest extent doableInstall CAT 6 cable from new community controllers again to LCS telecom room for connection/configuration by others.Commissioning and proprietor demonstration labor as recognized typically scope abovePerforming Arts Center Upgrade (Kinston High Site)Furnish and set up Network controller(s) and Bacnet IP DDC panelsInstall new communication wiring (IP) to every controller locationDemo present ACT management boards (Qty. 4), sensors and management units and change needed. Control valves/actuators, dampers and actuators are excluded from restore or substitute Mount new DDC panels with Bacnet IP DDC controllers instead of ACT management boardsReplace present house temp sensors, exterior air temp sensor and effectively temp sensors; wire to BAS controller(s)Remove and change house temperature sensors with sensors which embody LCD show, setpoint adjustment, and override If suitable with new system, re-use present duct and water temperature/strain sensors, present sensing standing switches, static strain transmitters, and low-limit thermostats the place suitable and re-wire present management factors from present controllers to new DDC controllers. All valves/actuators and damper/actuators to be re-used. If units are discovered faulty throughout new system startup, contractor shall notify the proprietor for path.Regardless of compatibility with new system, house mounted temperature sensors shall get replaced with sensors which embody LCD show, setpoint adjustment, and override.Reuse present enter/output wiring to the biggest extent doableInstall CAT 6 cable from new community controllers again to LCS telecom room for connection/configuration by others.Commissioning and proprietor demonstration labor as recognized typically scope aboveItems Not Included in Contractors Scope of Work:Any work at Bynum Teacher’s ES, Teacher’s Memorial ES or Sampson ES; Schools are completely closedAny work related to Boards #3 by means of #7 at Moss Hill ES. Only boards #1 and #2.Provision or set up (or substitute) of Variable Frequency DrivesRepair or troubleshooting of present Variable Frequency DrivesRepair or substitute of valves or dampers and their actuators of any kind. Any pneumatic element substitute (ie, compressor, dryer, pneumatic valves/actuators, pneumatic dampers/actuators, pneumatic thermostats, and so on.Repair or substitute of present zone dampersRepair or substitute of mechanical or electrical (apart from controls famous above) tools (ie, AHUs, RTUs, FCUs, fan motors, pulleys, belts, sheaves, coils, starters, disconnect switches, VFDs, valves, dampers, and so on.)Repair, substitute or furnishing of recent Flow Meters (Onicon or others)MER refrigerant monitoring and alarm units. Should be present to stay.Provision or set up (or substitute) of duct smoke detectors: set up labor or suppliesRepair or substitute of present gauges and thermometers, or circuit settersBalancing dampers, hearth/smoke dampers and their actuators, different dampers of any kind, and any set up laborInstallation of recent entry doorsPainting of conduitCeiling tile substituteInsulation/duct restore or substituteTest and Balance workIf above gadgets are decided to be wanted or gadgets repaired, they are going to be dealt with by proprietor’s contingency through change order.Bid Form:Bidder:Company Name:Address:Contractors Unlimited License Number:Base Bid Full purposeful system (all websites) all for the online sum of: $_________________ ______________________________________________________________________DollarsRESPECTFULLY SUBMITTED this ___________ day of ______________________, 202___.___________________________________________________(Name of agency or company making bid)By: _____________________________Title: _____________________________(Owner / Partner / President / Vice President)License No. _______________________Federal ID No. _____________________WITNESS: (Proprietorship / Partnership)By: __________________________________ATTEST: (Corporation)By: __________________________________ (CORPORATE SEAL)Title: _________________________________(Corporate Secretary or Asst. Secretary Only)For questions concerning this bid, please contact:Larry [email protected] you on your consideration.Pricing above consists of BAS server and all websites with scope detailed above and listed under:BAS server, licensing, and reviews server software program/config: Banks ES, all for the online sum of: Contentnea-Savannah Ok-8, all for the online sum of: LaGrange ES, all for the online sum of: Moss Hill ES, all for the online sum of: Northeast ES, all for the online sum of: Northwest ES, all for the online sum of: Pink Hill ES, all for the online sum of: Southeast ES, all for the online sum of: Southwood ES, all for the online sum of: E.B. Frink MS, all for the online sum of: Rochelle MS, all for the online sum of: Woodington MS, all for the online sum of: Kinston HS, all for the online sum of: North Lenoir HS, all for the online sum of: South Lenoir HS, all for the online sum of Performing Arts Center, all for the online sum of
https://www.neusenews.com/index/2022/8/15/public-notice-lenoir-county-public-schools-lenoir-county-schools-hvac-controls-upgrades-scope-of-work-mandatory-site-visit-cdftk-TRDXR